Process・2 min read
Less locating error
Every re-clamp adds locating error. On 5-axis, related features share one datum.
Shorter prototype lead time
With fewer fixtures and changeovers, prototypes typically drop from two weeks to five working days.
Better surface finish
Angled faces and deep pockets take shorter tool overhang: less chatter, better finish.


